Brickwork going up

The outside of the building is currently being clad with bricks, you will be able to see a lot of this going up from the roadside as well as the playground side. All the windows are in and the external doors have been installed.
Inside, the timber is being plaster-boarded and the electric, data cables and power services are all being installed.

Find out more about our school expansion here.